Koç Medical - Bıçakcılar Inc.

The cooling lines of the factory, which has a closed area of 36,000 m², were renovated, and cleanroom ventilation systems and EO sterilizer installation and application practices were carried out.

Industrial Production Facility

Industrial Plant Applications

36,000 m² Indoor Area

Yılmaz Kimya Plaza

Renovation, automation, and installation revisions were carried out on 500 fan-coil units in an area of 14,400 m².

Commercial Building

Mechanical Installation Project and Contracting Services.

14,400 m² Area

Assistant Istanbul Residence

Within the scope of the Asistanbul Residence project, the mechanical systems for 90 residences, office floors, and a 6-story indoor parking area were designed and implemented by our company.

The project included integrated planning of sanitary plumbing, fire protection systems, heating and cooling systems, and ventilation solutions; implementations were completed in accordance with the work schedule.

All systems were designed and commissioned with long-lasting operational performance and ease of maintenance in mind.

Residential + Commercial Mixed Project

Mechanical Installation Design & Contracting

90 Apartments + Office Spaces

The Public Hotel

Within the scope of the Public Hotel project, the mechanical installations and VRF air conditioning systems of the 54-room accommodation facility have been designed and implemented.

The heating and cooling infrastructure was designed based on energy efficiency and operational continuity; system integration was commissioned in accordance with the work schedule.

Hotel Project

Mechanical & VRF Air Conditioning Installation

Capacity of 54 Rooms

Rings Istanbul

Within the scope of the Rings Istanbul project, we carried out the natural gas infrastructure conversion applications for 600 residences and the shopping mall area.

The conversion of existing systems was planned taking into account safety and regulatory requirements; the gas distribution infrastructure was renewed and commissioned in accordance with technical standards.

Residential + Shopping Mall Mixed-Use Project

Natural Gas Conversion Application

Capacity of 600 Apartments

Çiçek Textile Factory

Within the scope of the Çiçek Textile Factory project, the mechanical installations for the production areas, administrative sections, and technical rooms were carried out by our company.

As part of the project, sanitary installations, ventilation, heating-cooling, and industrial infrastructure systems were implemented in accordance with technical standards; the systems were commissioned to support production continuity.

Industrial Production Facility

Mechanical Installation Contracting

Factory Structure

L’ist İstinye Suites

Within the scope of the L’ist İstinye Suites project, the VRF air conditioning systems for 150 independent residences have been designed and implemented.

The system design was planned based on energy efficiency and comfort requirements; the central air conditioning infrastructure has been commissioned in accordance with technical standards.

Housing Project

VRF Air Conditioning System Installation

Capacity for 150 Apartments

Evista Dormitory Building

Within the scope of the Evista Dormitory Building project, the mechanical installations and VRF air conditioning systems for the 60-bed capacity accommodation facility have been designed and implemented.

The system design was planned based on user comfort, energy efficiency, and operational continuity; all infrastructure applications were commissioned in accordance with technical standards.

Dormitory / Educational Institution

Mechanical & VRF System Installation

60 Bed Capacity

Aya Gokturk Houses

The mechanical systems for the residential blocks within the Aya Göktürk Evleri project were implemented by our company.

Within the project, sanitary plumbing, heating-cooling, and infrastructure systems were planned and implemented in accordance with technical standards.

The systems were commissioned with a focus on long-term operational performance and ease of maintenance.

Housing Project

Mechanical Installation Application

Site Layout

Ikebena Residences

The mechanical systems for the residential blocks within the Ikebena Residences project were implemented by our company.

Within the project, sanitary plumbing, heating-cooling, and infrastructure systems were planned and implemented in accordance with technical standards.

The systems were commissioned with a focus on long-lasting operational performance and safe use.

Housing Project

Mechanical Installation Application

Site Layout

Gumusyan Hotel & Restaurant

Within the scope of the Gümüşyan Hotel & Restaurant project, the mechanical installations and VRF air conditioning systems for the accommodation and dining areas were implemented by our company.

As part of the project, heating-cooling, plumbing and ventilation systems were planned in accordance with technical standards; and commissioned with operational comfort and energy efficiency as the main considerations.

Hotel + Restaurant Project

Mechanical & VRF System Installation

Accommodation and Food & Beverage Structure

Via Fuga Beach Hotel

Within the scope of the Via Fuga Beach Hotel project, the mechanical installations and VRF air conditioning systems for the accommodation areas were implemented by our company.

In the project, heating-cooling, plumbing and ventilation systems were planned with energy efficiency and user comfort in mind; all infrastructure applications were commissioned in accordance with technical standards.

Hotel Project

Mechanical & VRF System Installation

Beach / Tourism Structure

Cranes with buildings

Strong Mechanical Solutions Across Different Scales

Completed mechanical installation projects across residential, commercial, industrial, and public sector developments.

Our projects

Our Other Projects

Our Completed Projects

Below are selected projects from the mechanical installation, natural gas, and climate control solutions we have completed across different scales and sectors.

TÜRK TELEKOM KAVACIK CENTRAL OFFICE

Mechanical installation works at the Türk Telekom Kavacık Central Office were carried out by our team.
Heating, cooling, and technical infrastructure systems were planned and implemented in line with uninterrupted operational requirements.